What is the PLC control cabinet manufacturing standard?


Release time:

2023-11-21

PLC control cabinet with load, short circuit fault, phase failure maintenance and other maintenance functions. It has a compact structure, stable work, perfect function. PLC control cabinet can be composed according to the specific control gauge size, which can not only complete the single cabinet automatic control system, but also complete the multi-cabinet automatic control system of distribution center according to power line communication or industrial production computer interface Internet.

PLC control cabinet with load, short circuit fault, phase failure maintenance and other maintenance functions. It has a compact structure, stable work, perfect function. PLC control cabinet can be composed according to the specific control gauge size, which can not only complete the single cabinet automatic control system, but also complete the multi-cabinet automatic control system of distribution center according to power line communication or industrial production computer interface Internet.

1. The front and rear doors of the PLC control cabinet are made of 2.0mm thick cold-rolled plates, and both sides are made of 1.5mm thick cold-rolled plates.

2. The middle door and side door of PLC control cabinet shall be designed with the working condition of key machines and equipment in the glass sliding door to ensure the overall appearance of the cabinet door.

3. A rear cover plate is set up 100mm from the bottom end of the shell under the server cabinet. The rear cover plate is divided into front, back, left, and right parts.

4. The machine equipment components shall be installed in the front, rear, left and right layout of the control box, I .e. the two-sided side beam structure. The side beams in the middle of the front, rear, left and right side beams are 100mm and 300mm, and the middle door, rear side beam and side door are 400mm.

5. The exhaust fan shall be installed in the management center at the top of the PLC control cabinet, the fluorescent tubes of lighting lamps shall be installed at the front, back, left and right of the top of the cabinet, and the fluorescent tubes of lighting lamps shall be installed behind the top of the metrological verification cabinet.

6. The equal division grooves on both sides of the cabinet body close to the cabinet body baffle should be close to the cabinet body baffle to ensure a reasonable clean indoor space for the cabinet body.

7. The s7-300/400 side plate is installed on the insulating glue wood board and is insulated with the cabinet body.

8. The components and other components in the server cabinet of the programmable logic control board shall conform to the installation engineering drawings.

9. The routing in the server cabinet shall be designed according to the engineering drawings.